22 hour Saturday
Bangincups43 | 04-10-2016 | comment profile send pm notify |
Started of great in West Monroe, La with a lil house slab. Had an hour before my 2nd up so stopped at the Duck Dynasty shop to check it out, basically a gift shop. Miron Construction out of Wisconsin needed to get three little pours done to keep on schedule, apparently. Started at 230p. 3 setups and 2 washouts later I finally pulled off the job for a nice hour n a half drive back to the shop. Ohhh the life of a pump operator |