5 cool new videos, 40 meter pump tips over and gets uprighted and 4 other cool videos
Todd 02-11-2011
comment profile send pm notify

Check out the video section of ConcretePumping.com we have 5 new videos.

We have a 40 meter pump that tips over and than is uprighted.

We have a new clean out with air accident video

We have a 1977 Putzmeister video, cool.

we have a Putzmeister animation video, cool.

Go to the video section of this site and click on most recent. Enjoy and be safe.


Dipstick 02-11-2011
reply profile send pm notify

Looks like that 40m was short rigged on the right rear.. But still quite scary that it goes right thrue the floor like that. He had quite some dunnage under it. Maybe an example of when you short rigg the 'arm' gets smaller so the pressure on the outrigger increases by quite a large factor...

Many 02-11-2011
reply profile send pm notify

In the one pic before accident it looks like the r/r is deployed fully.When looking at L/R outrigger appears about 10' away from pads.That would indicate the pump just might have walked on riggers.If one backed the pump till L/R was on pad,looks like fully deployed on working side.

Just an observation


52putz 02-11-2011
reply profile send pm notify

Yea, with the way the pad on the R/R is flipped up in the hole, it looks like the outrigger walked off the pad.

16 CELL 02-11-2011
reply profile send pm notify

if that's a 46/47 meter Putz. (which it sure looks to be), the rear outrigger is shortrigged by a mile.....