Joel@4perllc.com | 03-21-2012 | comment profile send pm notify |
First house I've buried! Slab on deck roof and 2 layers of waterproofing plus 4 inches of styrofoam and silt fabric then 20 inches of topsoil. Sweet place if you have the money to build one!! |
||
Joel@4perllc.com | 03-21-2012 | reply profile send pm notify |
|
||
Joel@4perllc.com | 03-21-2012 | reply profile send pm notify |
|
||
Joel@4perllc.com | 03-21-2012 | reply profile send pm notify |
448 yards between this mat and a grade beam. concrete agonizingly slow, but otherwise it was right up my alley! Oh yeah, got rained on midway through the slab...always a pleasure!! |
||
Joel@4perllc.com | 03-21-2012 | reply profile send pm notify |
|
||
Joel@4perllc.com | 03-21-2012 | reply profile send pm notify |
200 yard wall. 3 ft thich and 14 feet tall on this lift. |
||
Joel@4perllc.com | 03-21-2012 | reply profile send pm notify |
Same wall job...also placed 1200 tons of stone around base of wall. Little tight getting set up and reaching to far corner, but otherwise rockin and rollin |
||
Joel@4perllc.com | 03-21-2012 | reply profile send pm notify |
And one of my weekend moonlightin rigs...just for schnitts and gurgles if there's any guys on here who likes road tractors. |
||
FIX-IT | 03-22-2012 | reply profile send pm notify |
TB 110s ROCK AND ROLL !!!!! |