wow | 04-07-2013 | comment profile send pm notify |
|
||
Mister_Perkins | 04-07-2013 | reply profile send pm notify |
Nice! Every time I do a hotel job in our area, were just filling block with grout, doing footers or filling pre-cast floor section gaps with grout. Pretty much everything is pre-cast |
||
pumpjockey | 04-07-2013 | reply profile send pm notify |
More commercial construction should be done with ICF. Public buildings especially, with the expected long life and 24 hour occupation, the long-term energy savings and structural integrity in the event of natural disasters. The speed they can be built and the short lead time for materials as compared to structural steel as well as the reduced design time required. |
||
jaybee | 04-08-2013 | reply profile send pm notify |
How come somebody builds a hotel in what looks like back-nd-beyond? Is it really a hotel? or a storehours? whatever the thing is, it is surely a Schwing 45 or 47 boom and that means that somebody is running about 12 m of end hose off that thing, reduced in the middle and then another 2 m or so. WOW! Now you guys take that down to Queensland work-safety and ask their opinion. Ha Ha! You're off the job in a twinkle! With a ticket!
|
||
Ne-max | 04-08-2013 | reply profile send pm notify |
Are you drunk?
Looks like a hotel to me. |