Look ma, a concrete man.
Todd | 08-30-2014 | comment profile send pm notify |
Type 50 that reaches full strength in 3 days and use it on a plus 30c day. The load was only one hour old when this happened. |
||
Todd | 08-30-2014 | reply profile send pm notify |
Blind side bro batched one hour before this and pumped off maybe one meter stopped to swing fifteen feet over and she locked up when I tried to pump again . Knocked off the hose swung around to circulate and she shat a pile 14 years never seen this. |