Munir | 05-14-2008 | comment profile send pm notify |
|
||
sccp jamie | 05-14-2008 | reply profile send pm notify |
wow! sod leaving your sandwich box down the bottom lol |
||
Bob | 05-14-2008 | reply profile send pm notify |
Those pics bring back some memories. No shutoff or diversion valves. No placing booms. Pump - Pipe - Hose and Pour it out Life was more simple then ;~) |
||
Munir | 05-14-2008 | reply profile send pm notify |
Mr. Bop Yes you are right. We have inside building more length of pipe line but I can’t make picture. After 25th floor we will use shutoff valve. Contractor is no hire placing boom because each floor is only 105m3 they are using tower crane. Thank you.
|
||
ruck | 05-14-2008 | reply profile send pm notify |
Munir Great pics, Any luck with jobs. Ruck |