today
toper 06-17-2009
comment profile send pm notify

200' of 4" off the 55m

toper 06-17-2009
reply profile send pm notify


toper 06-17-2009
reply profile send pm notify

waiting on the cleanup,

toper 06-17-2009
reply profile send pm notify

im the soon to be 55m operator,

Todd 06-18-2009
reply profile send pm notify

Sweet. Just remember dunage dunage dunage

Pumper Tom 06-18-2009
reply profile send pm notify

why the short out rigger on the drivers side ?

bull-frog 06-18-2009
reply profile send pm notify

Hey Pumper Tom, I like the pics of that old 43m putz.  What year is it?

biged 06-18-2009
reply profile send pm notify

Topper I got you beat I'm 60 running a line pump.

180 flyer 06-18-2009
reply profile send pm notify

Hey Toper, PM me Mark's cell phone#. Thanks.

toper 06-19-2009
reply profile send pm notify

if u look at the pic w/me in it theres a saftey cone ,there is a piece of old concrete that  the school super said not to touch  so my boss brought the leg back a bit, i ? it but he said its ok, were not pumping on that side, he set her up while i ran 200' of 4" for about 80 yrds, then after the line, i took a break and took over the boom, what a reward, seriously, the crew on the job were blown away, they figured i was just  a laborer.

i love my job


toper 06-19-2009
reply profile send pm notify

oh and todd thanks a bunch for the reminder , beleive me im a dunnage fan myself, if u look back at my old posts almost every job i did i use it,  but he's the boss and he set her up so i dont argue , on his defense however the ground is compacted solid, roller , jumping jack and tested , u know them school jobs , big time over kill on every thing