Concrete Pumping record for pumping down 2006
Down Pumping
With the same SCHWING BP 25 E at R J Shah & Co. The BP250 was used to pump M25 grade concrete down through 88 mtr. Pipeline which included 04 nos.90 degree bends and 07 nos. S bends. The Level Difference between pump and point 72 mtrs. (Down) For West Shotcreting Top Shot Mobile TSM 30.10 was used extensively for shotcreting of the tunnels.